Our clients range from individuals to major mining, engineering, electrical & consulting companies as well as petroleum clients.

Recent Projects:

October 2009 - Geotechnical Investigation, Lake Highway Bothwell

KMR were engaged to undertake drilling services of three geotechnical boreholes to investigate a slip and the cause of pavement movement on the road shoulder of the Lake Highway, Bothwell.
Unit- Rig No. 2) Hydrapower Scout MKIV, crew Dale Roberts and Geoff Carter.
Work was undertaken with one lane of the highway closed.The Rig was removed from site overnight to avoid traffic delays.

Geotechnical Investigation image 1 Geotechnical Investigation image 2 Geotechnical Investigation image 3 Click the image for a larger view...
All images © KMR Drilling 2009

August 2009 - KMR Undercover

KMR has just completed installation of groundwater monitoring bores inside an operational plant in Launceston. Work was completed with Rig No.3 Explorer 50.
Because of the confined space and limited head room available the Explorer 50 was well suited to this project.
Drilling methods included concrete coring, hollow flight auger drilling and continuous sampling.
The project was sucessfully completed with no disruption to the operation.

groundwater monitoring bores image 1 groundwater monitoring bores image 2 groundwater monitoring bores image 3 Click the image for a larger view...
All images © KMR Drilling 2009

June 2009 - Catagunya Dam: Water Pressure Testing

KMR were recently engaged to undertake water pressure testing on the existing drains at Catagunya Dam.
NQ inflatable injection packers were used to perform pressure meter testing.
Holes were pressurised to the required pressure using a helical rotor pump, pressures being recorded off calibrated pressure gauges and the "take" volume being recorded by a calibrated flow meter.
The project was completed to the satisfaction of the client.

Water Pressure Testing at Catagunya Dam image 1 Water Pressure Testing at Catagunya Dam image 2 Water Pressure Testing at Catagunya Dam image 3 Click the image for a larger view...
All images © KMR Drilling 2009

May/June 2009 - Henty Gold Mine: West Coast Tasmania

KMR carried out Geotechnical / Environmental drilling at Henty Gold Mine between May & June 2009.
A total of 50 holes were completed. Drilling included installation of groundwater monitoring bores into selected aquifers on the tailings dam and around the site.
Drilling methods consisted of hollow flight auger, HWT casing advancer, U63 push tubes, HQ3 wireline coring and down hole hammer drilling.
The project was completed within the estimated time schedule using Rig No.2 Truck mounted Hydrapower Scout MKIV.

Geotechnical / Environmental drilling at Henty Gold Mine image 1 Geotechnical / Environmental drilling at Henty Gold Mine image 2 Geotechnical / Environmental drilling at Henty Gold Mine image 3 Geotechnical / Environmental drilling at Henty Gold Mine image 4 Click the image for a larger view...
All images © KMR Drilling 2009